Make your own free website on Tripod.com
Final Touches 2003


Final Leveling

As expected, the boathouse moved very slightly during the first winter; and Tom sent out a crew in July 2003.

Within an hour or two, the boathouse was perfectly level once again.

Interior of store room
Interior of the Storeroom

Robert Sewell completed the interior of the storeroom himself.  The bench is sixteen feet long so a canoe can be strored underneath.  A second canoe can be suspended from the rafters as shown. 

More shelves and tool racks will be added.

The Finished Boathouse
The Finished Boathouse
 

Built by:

T.J. Evans Construction
Temagami, Ontario
705-569-3527

Click to return to the Previous Page.

Click to return to the Boathouse Home Page.

Please visit the Sewell Genealogy Site Map for other pages in this series.